Priority-based Control Engineering
– Present
- Maximized annual MISO market profit ($1M+) through real-time system optimizations and simulations
- Analyzed historical data to identify market trends
- Migrated an enterprise web app to Laravel in 3 months
- Migrated a legacy Visual Studio 6 C++ app to Visual Studio 2022 in 2 weeks
- Automated Windows Server IIS deployment via PowerShell
- Optimized legacy SQL queries from 35s to 2.2s
- Optimized app memory usage by 30% (~100 MB)
- Designed an entire RBAC user role system with auditing